What a 100kW BESS Can Power
- A factory or processing plant covering two evening shifts
- A hotel or resort with pool, kitchen and laundry loads
- A cold-storage or water-treatment plant
- A commercial microgrid with firm capacity requirements
What a 209kWh BESS can power
Usable energy of about 188kWh covers the critical loads of a mid-size facility through a typical outage window: refrigeration, lighting, IT, security and selected production circuits. At half its rated power the system runs for roughly 3.8 hours between charges.
Paired with solar, the battery shifts daytime generation into the evening peak and keeps critical circuits alive when the grid fails.
How to size storage for your site
Start from the critical load list (kW) and the hours of cover you need — not from the total site load. Energy (kWh) = critical kW × hours, adjusted for depth of discharge and reserve. Our team sizes the battery, PCS and protection against your outage pattern and tariff.