SOLAR POWER SYSTEMS BATTERY STORAGE EXPORTContact Force Solar ↗
ABOUT FORCE SOLAR

A Solar Power System Manufacturer

Force Solar brings engineering input, equipment selection, production, inspection planning and export preparation into one project scope.

A Solar Power System Manufacturer
OUR ROLE

Clarity across the complete system.

Buyers need more than a product list. They need to know what is inside the shipment, how the components work together and which records support the order.

We build the project conversation around load data, named equipment and documentation. Production and inspection scope are confirmed for the actual order.

WHAT TO EXPECT

A proposal you can check.

01

Defined architecture

On-grid, off-grid or hybrid based on site conditions.

02

Named components

Exact model and electrical interface in the final BOM.

03

Applicable evidence

Model documents and inspection records tied to the order.

04

Export scope

Packing and commercial documents aligned to destination.

WHAT WE SUPPLY

The scope we cover

Force Solar manufactures and supplies complete systems: the equipment is specified as one architecture, and the documentation travels with the shipment.

Supply scope
AreaRangeNotes
Solar power systems10kW to 1MWOn-grid, off-grid and hybrid, all hybrid-ready
BESS cabinets96kWh to 5MWhLiFePO4, IP54 outdoor cabinet with thermal management
Storage batteries15kWh to 500kWhLow-voltage packs and modular rack systems
ApplicationsFactory, hotel, farm, cold storage, homeEach sized to its own load profile
ExportSystems installed in 130 countriesPacking, commercial documents and inspection records per order

Ranges describe the catalogue. Every order is quoted against a confirmed bill of materials.

HOW AN ORDER RUNS

Five stages from brief to commissioning

The sequence is fixed because each stage produces the input the next one needs. Skipping ahead is how systems end up undersized or undocumented.

Order workflow
StageWhat happensTypical duration
Requirement definitionLoad data, site conditions, grid behaviour, backup target1 to 3 days
System designArchitecture, single-line diagram, component selection1 to 2 weeks
ProductionAssembly, configuration, factory acceptance checks1 to 3 weeks
Testing72-hour full-load test before shipment72 hours
Shipping and installationPacking, documents, commissioning support2 to 6 weeks

Total programme runs 4 to 12 weeks depending on configuration and destination. Durations are planning ranges, not commitments; the confirmed schedule comes with the quotation.

How a quotation from us is built

It starts from your load, not from a catalogue

A useful proposal begins with the interval load data, or failing that with the bills and the appliance or equipment list. Publishing a capacity before knowing the load shape is how systems end up sized for the wrong problem.

Every component is named

Each proposal names every component and states the role it plays in the complete system. That is deliberate: it is what lets you compare two quotations properly, rather than comparing two headline kilowatt figures that may not cover the same scope.

Durations are planning ranges, not promises

The five stages run from requirement definition through system design, production, testing and shipping. The ranges published here are planning figures. The confirmed schedule arrives with the quotation, once configuration and destination are known.

Where we work

We build for export markets rather than a single domestic grid. Current project and partner markets include Nigeria, Ghana, Kenya, the Philippines, Central America, the Caribbean and the Middle East — all regions where grid reliability, tariff levels and diesel dependence shape what the right system looks like.

Go deeper into how we work

START A PROJECT

Start with a project brief.

Tell us your market, site and support needs. We can define the next technical questions.

Request a system proposal
WhatsApp+86 137 0282 0912