ABOUT FORCE SOLAR

A Solar Power System Export Partner

Force Solar brings engineering input, equipment selection, production coordination, inspection planning and export preparation into one project scope.

A Solar Power System Export Partner
OUR ROLE

Clarity across the complete system.

Buyers need more than a product list. They need to know what is inside the shipment, how the components work together and which records support the order.

We build the project conversation around load data, named equipment and documentation. The production partner and inspection scope are identified for the actual order.

WHAT TO EXPECT

A proposal you can check.

01

Defined architecture

On-grid, off-grid or hybrid based on site conditions.

02

Named components

Exact model and electrical interface in the final BOM.

03

Applicable evidence

Model documents and inspection records tied to the order.

04

Export scope

Packing and commercial documents aligned to destination.

WHAT WE SUPPLY

The scope we cover

Force Solar works as the export partner on complete systems: the equipment is specified as one architecture, and the documentation travels with the shipment.

Supply scope
AreaRangeNotes
Solar power systems10kW to 1MWOn-grid, off-grid and hybrid, all hybrid-ready
BESS cabinets96kWh to 5MWhLiFePO4, IP54 outdoor cabinet with thermal management
Storage batteries15kWh to 500kWhLow-voltage packs and modular rack systems
ApplicationsFactory, hotel, farm, cold storage, homeEach sized to its own load profile
ExportSystems installed in 130 countriesPacking, commercial documents and inspection records per order

Ranges describe the catalogue. Every order is quoted against a confirmed bill of materials.

HOW AN ORDER RUNS

Five stages from brief to commissioning

The sequence is fixed because each stage produces the input the next one needs. Skipping ahead is how systems end up undersized or undocumented.

Order workflow
StageWhat happensTypical duration
Requirement definitionLoad data, site conditions, grid behaviour, backup target1 to 3 days
System designArchitecture, single-line diagram, component selection1 to 2 weeks
ProductionAssembly, configuration, factory acceptance checks1 to 3 weeks
Testing72-hour full-load test before shipment72 hours
Shipping and installationPacking, documents, commissioning support2 to 6 weeks

Total programme runs 4 to 12 weeks depending on configuration and destination. Durations are planning ranges, not commitments; the confirmed schedule comes with the quotation.