How a quotation from us is built
It starts from your load, not from a catalogue
A useful proposal begins with the interval load data, or failing that with the bills and the appliance or equipment list. Publishing a capacity before knowing the load shape is how systems end up sized for the wrong problem.
Every component is named
Each proposal names every component and states the role it plays in the complete system. That is deliberate: it is what lets you compare two quotations properly, rather than comparing two headline kilowatt figures that may not cover the same scope.
Durations are planning ranges, not promises
The five stages run from requirement definition through system design, production, testing and shipping. The ranges published here are planning figures. The confirmed schedule arrives with the quotation, once configuration and destination are known.