COMMERCIAL & INDUSTRIAL

Solar System for Factory

Rooftop or ground PV from 100kW to 1MW+, engineered around shift patterns, demand peaks and grid reliability — with optional BESS.

Request a configurationCompare system types
Solar System for Factory equipment and application visual
ApplicationFactories and facilities
ArchitectureOn-grid or hybrid
Sizing basisInterval loads + grid
THE SHORT ANSWER

What this system is designed to do.

A factory solar system is sized from interval loads, available roof or land, grid conditions and the value of storage. Daytime-heavy production is the strongest solar business case in most export markets.

Final equipment, capacity, model availability and local compliance are confirmed against the project brief and destination.

EQUIPMENT SCOPE

System scope.

A useful proposal names each component and explains how it fits into the complete system.

Solar System for Factory visual
ComponentSelection basis
PV arrayModule layout and mounting for site conditions
InvertersString inverters in parallel, matched to voltage and utility interface
Optional BESS96kWh–5MWh storage for backup and peak management
Electrical BOSProtection, distribution, monitoring and documentation
PRODUCT GALLERY

Systems for this application.

Factory and supermarket configurations, from rooftop PV through to outdoor-cabinet storage.

SIZING EXAMPLES

Explore reference capacities.

These combinations follow the supplied product range and are starting points for a load-based proposal.

REFERENCE CONFIGURATION100 kW + 215 kWhFactory or facility reference configuration
REFERENCE CONFIGURATION250 kW hybridFarm or factory with outage cover
REFERENCE CONFIGURATION400 kW on-gridThree-shift manufacturing reference

Images show product concepts or representative equipment. Exact models, usable capacity, chemistry, ratings, certification and warranty are confirmed in the project bill of materials.

ENGINEERING INPUTS

What we need to size it.

Give us the facts you have; the remaining questions can follow in engineering review.

Send your project brief
  1. Interval load data or monthly bills
  2. Site plan, roof structure and grid connection
  3. Peak loads, shift hours and backup target
TECHNICAL FAQ

Before you choose a configuration

These answers describe system selection. Final equipment and compliance depend on the agreed model and destination.

When does a factory need BESS?

When outages stop production, when demand charges punish peaks, or when solar energy must be shifted to a second shift. The value is calculated from your load and tariff.

What documents come with the order?

Named bill of materials, single-line diagram, model certificates, manuals and inspection records.

How it is sized

Capacity first, then hardware. Working through these steps in order is what keeps a quotation honest — each one narrows the answer the next one depends on.

The load curve comes first

Interval load data, or twelve months of bills, tells you how much solar the factory can consume directly and how much has to be shifted. Nothing else can be sized until that curve is known.

Decide what storage is actually for

On a factory, storage earns its cost in three specific cases: when outages stop production, when demand charges punish peaks, or when solar energy has to be moved to a second shift. If none of those apply, phase one is usually PV alone.

Verify structure before layout

Site plan, roof structure and grid connection govern what can physically be installed and what the utility will permit. They have to be checked before an array capacity figure means anything.

FIT CHECK

Where this fits — and where it does not

Saying what a product is not for is usually more useful than another list of what it can do.

SituationVerdict
Three-shift plants with heavy daytime consumptionSolar offsets the expensive daytime hours
Sites penalised by demand chargesPeak management is what justifies storage
Plants losing production to outagesBackup is the storage case
Predominantly night-shift loadPV alone cannot serve it — storage becomes essential
Unverified roof structureSurvey first; the structure caps achievable array size

Frequently asked questions

How long does it take to deliver the Solar System for Factory?

End to end, 4–12 weeks. Requirement definition takes 1–3 days, system design 1–2 weeks, production 1–3 weeks, then every unit completes a 72-hour test before shipping, and shipping and installation take 2–6 weeks depending on the destination.

Is the Solar System for Factory configuration fixed?

No. What is shown on this page is the reference configuration for the model — every system is sized against its own load data before it is quoted.

What testing does the Solar System for Factory go through before shipping?

A 72-hour test. It is the fourth of five steps in our delivery process: requirement definition, system design, production, testing, then shipping and installation.

What is included in the Solar System for Factory price?

Every component named on the quotation, plus factory assembly, the 72-hour test, export packing and the documentation set. Not included: sea freight, import duties and taxes, and site labour. Each quotation lists these on separate lines, so you can compare suppliers on the same basis.

Is installation included with the Solar System for Factory?

Not as on-site labour. Our scope: the equipment as specified, tested before it ships, with the drawings and documentation your contractor works from, plus remote commissioning support and spare parts. Your scope: the base and civil works, crane placement, AC cable runs, the grid-connection cabinet and metering, local permits, and the installation labour. We do not keep installation crews abroad, so site work and its cost are quoted by your own contractor or local EPC.

START A PROJECT

Ready to design your solar power system?

Share the site load, location and required backup time. We will define the information needed for a useful proposal.

Request a system proposal