SOLAR POWER SYSTEMS BATTERY STORAGE EXPORTContact Force Solar ↗
PV MODULES

Solar Panels & PV Modules

Select modules by electrical fit, installation space, mounting method and destination requirements.

Request a configurationCompare system types
Solar Panels & PV Modules equipment and application visual
RoleSolar generation
SelectionPower + dimensions
EvidenceModel-specific documents
THE SHORT ANSWER

What this system is designed to do.

Solar panels form the generation side of a solar power system. Module technology and dimensions should be chosen alongside inverter voltage windows, site layout and applicable model documents.

Final equipment, capacity, model availability and local compliance are confirmed against the project brief and destination.

EQUIPMENT SCOPE

Product selection.

A useful proposal names each component and explains how it fits into the complete system.

Solar Panels & PV Modules visual
ComponentSelection basis
Module technologySelected for available space and project priorities
Electrical ratingsVoltage and current matched to string design
Mechanical designDimensions, mounting and environmental loads
DocumentationExact model datasheet and applicable certificates
ENGINEERING INPUTS

What we need to size it.

Give us the facts you have; the remaining questions can follow in engineering review.

Send your project brief
  1. Roof or ground area and mounting type
  2. Target PV capacity and inverter topology
  3. Destination market and required model evidence
TECHNICAL FAQ

Before you choose a configuration

These answers describe system selection. Final equipment and compliance depend on the agreed model and destination.

Which panel type should I choose?

Compare module dimensions, electrical ratings, warranty terms and certificates against the site design rather than choosing on wattage alone.

Can panels from different models be mixed?

Mixing requires careful string and inverter design and is generally not assumed in a standard package.

How it is sized

Capacity first, then hardware. Working through these steps in order is what keeps a quotation honest — each one narrows the answer the next one depends on.

Start from the available area

Module choice begins with how much usable roof or ground exists and how it can be mounted. Area, not the wattage on the datasheet, is what sets what the array can physically deliver.

Match the electrical design

Voltage and current have to fit the string design, and dimensions have to fit the mounting system and the local environmental loads. Two modules with the same rating can behave very differently inside a given string.

Compare on paperwork, not just watts

Compare module dimensions, electrical ratings, warranty terms and certificates against the site design rather than choosing on wattage alone. The destination market usually decides which certificates actually matter.

FIT CHECK

Where this fits — and where it does not

Saying what a product is not for is usually more useful than another list of what it can do.

SituationVerdict
Extending or replacing an existing arrayForm factor and string behaviour matter most
Space-constrained rooftopsHigher-efficiency modules chosen for the available area
Any project with a named destination marketModel evidence has to match that market
Choosing on the highest wattage number aloneUsually the wrong comparison
Orders without agreed model certificatesCannot ship until the evidence is settled
AFTER INSTALLATION

What reduces output once the array is live.

A module datasheet is measured under standard test conditions. A roof is not. These are the four mechanisms that close the gap, and none of them is a defect — they are design inputs.

Why a live array produces less than its nameplate
CauseWhat it doesWhat to do about it
HeatCells lose voltage as they get hotter, so a hot roof produces less than the same module in a cool testAllow for ventilation behind the array and expect the hot-season figure to be the honest one
Soiling and dustA film on the glass reduces the light reaching the cellSet a cleaning interval that matches the site; dry and dusty locations need more of it
ShadingA shaded part of a string affects the whole string, not only the shaded moduleSurvey the roof at the times of day that matter, not just at noon
String mismatchModules of differing behaviour in one string pull the output toward the weakestKeep strings consistent, and treat additions to an existing array as an electrical question, not just a mechanical one
BEFORE SHIPPING

Documents to settle before the order ships.

Panel selection is settled on paperwork as much as on watts. These are the items to agree while the order is still on paper.

The exact model datasheet

Not a family brochure — the datasheet for the model that will actually be shipped, with the electrical ratings the string design was built around.

Certificates for the destination market

The evidence has to match the market the container is going to. A certificate that covers a different market does not help at customs or at inspection.

Mechanical and environmental ratings

Dimensions, mounting method and the loads the frame is rated for. These decide the racking, and racking is ordered before the modules arrive.

Frequently asked questions

How long does it take to deliver the Solar Panels?

End to end, 4–12 weeks. Requirement definition takes 1–3 days, system design 1–2 weeks, production 1–3 weeks, then every unit completes a 72-hour test before shipping, and shipping and installation take 2–6 weeks depending on the destination.

Is the Solar Panels configuration fixed?

No. What is shown on this page is the reference configuration for the model — every system is sized against its own load data before it is quoted.

What testing does the Solar Panels go through before shipping?

A 72-hour test. It is the fourth of five steps in our delivery process: requirement definition, system design, production, testing, then shipping and installation.

What is included in the Solar Panels price?

Every item named on the quotation, together with export packing and the documentation set. Not included: sea freight, import duties and taxes, and site labour. Each quotation lists these on separate lines, so you can compare suppliers on the same basis.

Is installation included with the Solar Panels?

Not as on-site labour. Our scope: the equipment as specified, tested before it ships, with the drawings and documentation your contractor works from, plus remote commissioning support and spare parts. Your scope: the base and civil works, crane placement, AC cable runs, the grid-connection cabinet and metering, local permits, and the installation labour. We do not keep installation crews abroad, so site work and its cost are quoted by your own contractor or local EPC.

START A PROJECT

Ready to design your solar power system?

Share the site load, location and required backup time. We will define the information needed for a useful proposal.

Request a system proposal
WhatsApp+86 137 0282 0912