Commercial and industrial solar and battery systems for five markets where grid power is expensive, unreliable, or both. The hardware is the same everywhere; what changes is the tariff you are displacing, the hours the grid actually delivers, and how much of your generation you are allowed to sell back.

Aerial view of a factory rooftop solar array
THE SHORT ANSWER

Which markets do we serve?

We engineer and supply commercial solar and battery systems for the Philippines, Nigeria, Ghana, Kenya, and the Caribbean and Central America. In every one of them the design starts from your own electricity bills, your generator hours and the loads that have to stay on — the tariff band, the export rule and the outage pattern then decide how much battery the project actually needs.

We supply and engineer the complete system. Installation and after-sales are carried out by your local EPC contractor or installer, with our engineering support behind them.

MARKET BY MARKET

What changes the design.

One table, five markets. The point is not which country is cheapest — it is that the same 500 kW array is a different machine in each of them.

Tariff, grid and export rules across the markets we serve
MarketWhat a kilowatt-hour costsWhat the grid doesExport ruleDetail
PhilippinesSelf-consumption avoids about ₱10–12/kWh at Meralco retail rates; exported units are credited at the blended generation rate, about ₱5–7/kWhSupply is generally reliable; the typhoon belt governs the mounting and wind-load specificationNet metering up to 100 kW is the safe planning assumption. A reported 2026 move toward 1 MW is not consistently confirmed — get your utility to confirm in writing before sizing above 100 kWPhilippines guide
NigeriaBand A feeders about ₦209.5/kWh published; diesel self-generation lands near ₦310–430/kWh on fuel alone at posted pump prices — and nearer ₦361–514/kWh at delivered pricesSupply is sold in bands by guaranteed hours a day, from 20+ down to 4 — the shortfall is what your generator coversRarely the binding constraint. The outage pattern, not the export rate, decides the batteryNigeria guide
KenyaCommercial all-in about KES 22–28/kWh once fuel, forex, levies and VAT are stacked on the base rateReliable but costly; the fuel cost charge and forex adjustment move every monthNet metering is available up to 1 MW, and exported units are credited at 50% of the units exported. No EPRA licence is needed below 1 MW for own useKenya guide
GhanaPURC reviews tariffs quarterly. The Q4 2026 decision held every category at Q3 levels with a 0% adjustment, effective 1 October — read the current gazette for your band before you build a payback model on last quarter’s numberHotels, farms and cold rooms usually size against the evening peak and the generator hours they want to removeCheck your band’s current terms with ECG and PURC before assuming an export credit in the modelGhana guide
Caribbean & Central AmericaIsland electricity commonly runs US$0.28–0.35/kWh, and diesel-generated power costs more againHurricane belt: mounting, enclosures and corrosion protection are specification items, not optional extrasIn Jamaica, net billing is capped at 100 kW for commercial customers and the rate is the short-term variable avoided cost of generation plus a 15% renewable premium. The capacity limits are under review as of 2026Caribbean guide

Tariffs and export rules move, and in Nigeria buyers report paying 15–20% above posted diesel prices because fuel is bought on the black market — so treat published figures as the floor, not the bill. Every number here is a starting point for a conversation, not the number you sign a payback model against; we re-check the current rate with you before a proposal is issued.

HOW WE WORK

The same delivery process, wherever you are.

Five steps, end to end 4–12 weeks. Every unit completes a 72-hour test before it ships.

Delivery steps and typical duration
StepWhat happensTypical duration
Requirement definitionWe read your bills, load list and site conditions and agree what the system has to do1–3 days
System designArchitecture, bill of materials and drawings sized to your load profile1–2 weeks
ProductionBuild and assembly, including the battery and control cabinet1–3 weeks
TestingEvery unit runs a 72-hour test before it is released for shipping72 hours
Shipping & installationPacked and shipped to your port; installed by your local EPC or installer with our engineering support2–6 weeks
ENGINEERING INPUTS

What we need to size it.

Send what you already have. Anything missing can follow during engineering review.

Send your project brief
  1. Last 12 months of electricity bills, or a recent month if that is all you have
  2. Generator size and the hours it runs per day or week
  3. The loads that must stay on during an outage, and for how long
  4. Roof or ground area available, with photos if possible
  5. Destination port and grid voltage

Not sure what to send? The project brief checklist lists the nine items and what each one is used for.

Frequently asked questions

Do you install the system yourself?

No. We engineer and supply the complete system. Installation and after-sales are carried out by your local EPC contractor or installer, with our engineering support behind them — that is how we work in every market on this page.

How long does delivery take?

End to end, 4–12 weeks. Requirement definition takes 1–3 days, system design 1–2 weeks, production 1–3 weeks, then every unit completes a 72-hour test before shipping, and shipping and installation take 2–6 weeks depending on the destination.

Do you use one standard design across all five markets?

No. The hardware range is common, but every system is sized against its own load data, tariff band and outage pattern before it is quoted. A design that pays back in Lagos is usually the wrong design in Manila.

Who do you sell to?

Distributors, EPC contractors, installers and project owners. What does not change is the sequence: we size the system first, then quote it.

Are the tariff figures on this page the current rates?

They are the published figures we work from, and they move — PURC reviews quarterly, NERC adjusts Band A for exchange rate, inflation and gas costs, and EPRA revises fuel and forex charges monthly. We re-check the current published rate with you before a proposal is issued.

What if my market is not on this list?

Send the brief anyway. These five are where we have published design guidance, not a hard boundary — the sizing logic is the same, and we will tell you honestly whether we can support your destination.

START A PROJECT

Tell us where the system is going.

Send your bills, generator hours and the loads that have to stay on. We will come back with the architecture and a sized bill of materials.

Request a system proposal