100kW Solar + Battery Storage for a Wastewater Plant in Sudan

A 100kW hybrid solar system with battery storage for a wastewater treatment facility — critical pumps and aeration protected from grid failures.

Get the same resultsAll projects
Technicians installing the battery cabinet at the wastewater facility
Capacity100 kW PV + battery
ArchitectureHybrid
ApplicationWastewater treatment
MarketSudan

Project Background

Wastewater treatment cannot simply stop when the grid does — pumps, aeration and control systems must run continuously. This facility faced an unreliable grid and depended on diesel generation for continuity.

The objectives were clear: cut diesel runtime, protect the process, and keep the design maintainable with locally available skills.

The challenge

Continuous process loads, an unreliable grid, and high diesel costs — in a hot, dusty installation environment.

The Solution

A hybrid architecture was configured: PV supplies the daytime process load, the battery bridges outages for critical circuits, and the diesel generator remains only for extended events.

Battery cabinets and electrical equipment were specified for high-temperature, dusty conditions, with installation handled by the local team under remote engineering guidance.

SYSTEM CONFIGURATION

What was supplied.

The configuration below is the reference for this project; every new system is sized against its own load data.

ComponentConfiguration
Solar panels≈ 180 × 550W modules
Hybrid inverters3-phase with battery and generator input
BatteryLFP cabinet storage, sized to critical loads
ProtectionDust-rated enclosures, SPD and surge protection

Results & ROI

  • Diesel generator runtime drops to extended-outage events only; solar carries the daylight process load.
  • Critical circuits remain powered through grid failures without process interruption.

Performance figures are engineering estimates from the project configuration unless stated otherwise.

IMPLEMENTATION TIMELINE

From survey to commissioning.

Typical export project sequence — actual dates depend on destination and site.

Week 1–2

Load audit and critical circuit list

Week 3–4

Engineering and export packing

Week 5–9

Shipment and customs

Week 10–14

Installation and commissioning

PROJECT GALLERY

Installation records.