SUDAN · WASTEWATER

100kW Solar + Battery Storage for a Wastewater Plant in Sudan

A 100kW hybrid solar system with battery storage for a wastewater treatment facility — critical pumps and aeration protected from grid failures.

Get the same resultsAll projects
Technicians installing the battery cabinet at the wastewater facility
Capacity100 kW PV + battery
ArchitectureHybrid
ApplicationWastewater treatment
MarketSudan

Project Background

Wastewater treatment cannot simply stop when the grid does — pumps, aeration and control systems must run continuously. This facility faced an unreliable grid and depended on diesel generation for continuity.

The objectives were clear: cut diesel runtime, protect the process, and keep the design maintainable with locally available skills.

The challenge

Continuous process loads, an unreliable grid, and high diesel costs — in a hot, dusty installation environment.

The Solution

A hybrid architecture was configured: PV supplies the daytime process load, the battery bridges outages for critical circuits, and the diesel generator remains only for extended events.

Battery cabinets and electrical equipment were specified for high-temperature, dusty conditions, with installation handled by the local team under remote engineering guidance.

SYSTEM CONFIGURATION

What was supplied.

The configuration below is the reference for this project; every new system is sized against its own load data.

ComponentConfiguration
Solar panels≈ 180 × 550W modules
Hybrid inverters3-phase with battery and generator input
BatteryLFP cabinet storage, sized to critical loads
ProtectionDust-rated enclosures, SPD and surge protection

Results & ROI

  • Diesel generator runtime drops to extended-outage events only; solar carries the daylight process load.
  • Critical circuits remain powered through grid failures without process interruption.

Performance figures are engineering estimates from the project configuration unless stated otherwise.

Why this architecture was chosen

Why this could not be a grid-tied system

Wastewater treatment cannot simply stop when the grid does — pumps, aeration and control systems have to run continuously. That single constraint removes grid-tied from consideration, because it would switch off exactly when the process most needs power. A hybrid architecture is what keeps the plant running through failures.

Why the generator was kept rather than removed

Sizing a battery to cover every conceivable outage is expensive and rarely justified. Keeping the generator for extended events while the battery bridges the common short failures is what makes the numbers work — and it meets the stated objective of cutting diesel runtime rather than eliminating the asset.

COMPONENT NOTES

Why each part was specified this way

Every quantity below is the one actually installed — nothing here is illustrative.

ComponentWhat it does on this site
≈ 180 × 550 W modules≈ 100 kW sized to cover the daylight process load.
Three-phase hybrid invertersAccept both battery and generator input, so all three sources are coordinated by one machine.
LFP cabinet storage sized to critical loadsSized to the critical circuits rather than the whole plant — which is affordable precisely because not everything needs backing up.
Dust-rated enclosures, SPD and surge protectionSpecified for a hot, dusty installation environment, not a default specification.

Applying this to your site

The value in a project like this is not the equipment list — it is the sequence of decisions behind it. If your site resembles this one, these are the questions worth answering before anyone quotes a capacity.

  • Write the critical circuit list first. It is the difference between a battery you can afford and one you cannot.
  • Separate "must never stop" from "can wait". Backing up everything is how these projects get priced out.
  • Specify enclosures for the real environment — heat and dust shorten equipment life faster than load does.
  • Decide who maintains it. This project was kept maintainable with locally available skills and installed under remote guidance.
  • Keep the generator until the outage record proves it is unnecessary.
IMPLEMENTATION TIMELINE

From survey to commissioning.

Typical export project sequence — actual dates depend on destination and site.

Week 1–2

Load audit and critical circuit list

Week 3–4

Engineering and export packing

Week 5–9

Shipment and customs

Week 10–14

Installation and commissioning

PROJECT GALLERY

Installation records.

Frequently asked questions

How does the plant stay running when the grid fails?

PV supplies the daytime process load, the battery bridges outages for critical circuits, and the diesel generator remains for extended events.

How was the equipment adapted to the site?

Battery cabinets and electrical equipment were specified for high-temperature, dusty conditions.

Who carried out the installation?

The local team, working under remote guidance — the design was kept maintainable with locally available skills.

What was the objective of this project?

To cut diesel runtime, protect the treatment process and keep the system maintainable. Pumps, aeration and control systems cannot simply stop when the grid does.