SOLAR POWER SYSTEMS BATTERY STORAGE EXPORTContact Force Solar ↗
BESS SOLAR SYSTEM

BESS Solar System

Battery energy storage systems from 96kWh to 5MWh: bidirectional inverters, LFP banks, thermal management and EMS in one tested cabinet.

BESS Solar System
PRODUCTS IN THIS CATEGORY

11 products.

Every model below can be configured for your voltage, grid and destination — send the load profile for a sized proposal.

125KVA 125kW+261kWh BESS Solar System
BESS SOLAR SYSTEM

125KVA 125kW+261kWh BESS Solar System

125kW of power, 261kWh of LFP storage — backup and solar shifting in one cabinet.

125 kW261 kWh
100KVA 100kW+215kWh BESS Solar System
BESS SOLAR SYSTEM

100KVA 100kW+215kWh BESS Solar System

100kW of power, 215kWh of LFP storage — backup and solar shifting in one cabinet.

100 kW215 kWh
100KVA 100kW+209kWh BESS Solar System
BESS SOLAR SYSTEM

100KVA 100kW+209kWh BESS Solar System

100kW of power, 209kWh of LFP storage — backup and solar shifting in one cabinet.

100 kW209 kWh
50KVA 50kW+112kWh BESS Solar System
BESS SOLAR SYSTEM

50KVA 50kW+112kWh BESS Solar System

50kW of power, 112kWh of LFP storage — backup and solar shifting in one cabinet.

50 kW112 kWh
40KVA 40kW+96kWh BESS Solar System
BESS SOLAR SYSTEM

40KVA 40kW+96kWh BESS Solar System

40kW of power, 96kWh of LFP storage — backup and solar shifting in one cabinet.

40 kW96 kWh
Solar System for House
APPLICATION SOLUTION

Solar System for House

Rooftop PV, a hybrid inverter and LFP storage configured around household energy use and outage priorities.

Loads, roof and backup
Solar System for Farm
APPLICATION SOLUTION

Solar System for Farm

Solar for irrigation pumping, cold rooms and farm buildings.

Water + cold chain
Solar Power System for Hotel
APPLICATION SOLUTION

Solar Power System for Hotel

Solar plus storage that protects the guest experience.

Evening load + backup
Solar System for Factory
APPLICATION SOLUTION

Solar System for Factory

Rooftop or ground PV from 100kW to 1MW+, engineered around shift patterns, demand peaks and grid reliability.

Interval loads + grid
1MW 1000kVA Solar System
ON AND OFF GRID

1MW 1000kVA Solar System

Complete 1MW solar power system for industrial sites — hybrid-ready.

1MWHybrid-ready
15KW 15KVA + 50KWH Solar System with Battery
HYBRID WITH BATTERY

15KW 15KVA + 50KWH Solar System with Battery

15kW of three-phase power with 50kWh of LFP storage in a single cabinet.

15 kW50 kWh
OTHER CATEGORIES

Continue browsing.

The same product can appear in several categories — storage, power rating and application overlap by design.

MODEL RANGE

BESS models at a glance

Six cabinet models cover 96kWh to 261kWh. Usable energy is the nominal capacity taken to 90% depth of discharge, which is the number that decides how long a bank actually carries load.

BESS cabinet range: nominal capacity and usable energy
ModelRated powerNominal capacityUsable at 90% DoDCycle life
FS-BESS-9640kW / 40kVA96kWh LiFePO486.4kWh6,000+ cycles at 80% EOL
FS-BESS-11250kW / 50kVA112kWh LiFePO4100.8kWh6,000+ cycles at 80% EOL
FS-BESS-19380kW / 80kVA193kWh LiFePO4173.7kWh6,000+ cycles at 80% EOL
FS-BESS-209100kW / 100kVA209kWh LiFePO4188.1kWh6,000+ cycles at 80% EOL
FS-BESS-215100kW / 100kVA215kWh LiFePO4193.5kWh6,000+ cycles at 80% EOL
FS-BESS-261125kW / 125kVA261kWh LiFePO4234.9kWh6,000+ cycles at 80% EOL

Usable energy equals nominal capacity multiplied by 90% depth of discharge. Containerised projects extend the same architecture to 5MWh; the models above are the standard cabinet sizes.

READING THE NUMBERS

What the cycle-life figure does and does not tell you.

The table above quotes cycle life at a stated end-of-life condition. That is useful, and it is narrower than it looks.

It is quoted at a stated depth of discharge

Cycle life is a function of how deeply the bank is cycled, among other things. A figure quoted at one depth does not carry over unchanged to a site that routinely cycles deeper.

It is not a calendar life

A bank that is rarely cycled still ages. Sites that hold storage purely for emergencies should ask about calendar ageing as well as cycles, because the two fail in different ways.

It assumes a temperature

Cycle life and usable capacity both move with temperature. In a hot climate the cabinet cooling is not an accessory — it is part of what the cycle-life figure is predicated on. What heat does to storage goes through this properly.

THE QUOTATION

What a BESS quotation should itemise.

Two quotations for the same nominal capacity are not comparable until they break down the same way. These are the lines worth insisting on.

Lines to expect on a BESS quotation
LineWhy it matters
Rated power and nominal capacityThe two are separate; a bank can have the capacity but not the power to deliver it quickly
Usable energy at the stated depth of dischargeThe figure the site can actually draw, which is not the nameplate
Inverter or power conversionWhether it is included, and what it is rated to carry
Enclosure and coolingOutdoor cabinet with its own cooling, or indoor rack
Expansion pathWhether capacity can be added, and what that requires electrically
What is not includedFreight, duties, local installation and grid approval are usually separate — see what a quote leaves out
PRODUCT GALLERY

BESS configurations.

The cabinet range, drawn as it ships.

Frequently asked questions

How long does it take to deliver the BESS Solar System?

End to end, 4–12 weeks. Requirement definition takes 1–3 days, system design 1–2 weeks, production 1–3 weeks, then every unit completes a 72-hour test before shipping, and shipping and installation take 2–6 weeks depending on the destination.

Is the BESS Solar System configuration fixed?

No. What is shown on this page is the reference configuration for the model — every system is sized against its own load data before it is quoted.

What testing does the BESS Solar System go through before shipping?

A 72-hour test. It is the fourth of five steps in our delivery process: requirement definition, system design, production, testing, then shipping and installation.

What is included in the BESS Solar System price?

Every component named on the quotation, plus factory assembly, the 72-hour test, export packing and the documentation set. Not included: sea freight, import duties and taxes, and site labour. Each quotation lists these on separate lines, so you can compare suppliers on the same basis.

Is installation included with the BESS Solar System?

Not as on-site labour. Our scope: the equipment as specified, tested before it ships, with the drawings and documentation your contractor works from, plus remote commissioning support and spare parts. Your scope: the base and civil works, crane placement, AC cable runs, the grid-connection cabinet and metering, local permits, and the installation labour. We do not keep installation crews abroad, so site work and its cost are quoted by your own contractor or local EPC.

START A PROJECT

Not sure which category fits?

Send the load profile, grid conditions and destination — we will name the architecture and the bill of materials.

Request a system proposal
WhatsApp+86 137 0282 0912