On and Off Grid Solar System
Systems that run with the utility or without it — BESS cabinets, all-in-one hybrid kits and packaged solutions for sites where the grid cannot be assumed.

12 products.
Every model below can be configured for your voltage, grid and destination — send the load profile for a sized proposal.

40KVA 40kW+96kWh BESS Solar System
40kW of power, 96kWh of LFP storage — backup and solar shifting in one cabinet.

50KVA 50kW+112kWh BESS Solar System
50kW of power, 112kWh of LFP storage — backup and solar shifting in one cabinet.

80KVA 80kW+193kWh BESS Solar System
80kW of power, 193kWh of LFP storage — backup and solar shifting in one cabinet.

100KVA 100kW+215kWh BESS Solar System
100kW of power, 215kWh of LFP storage — backup and solar shifting in one cabinet.

100KVA 100kW+209kWh BESS Solar System
100kW of power, 209kWh of LFP storage — backup and solar shifting in one cabinet.

125KVA 125kW+261kWh BESS Solar System
125kW of power, 261kWh of LFP storage — backup and solar shifting in one cabinet.

Solar System for House
Rooftop PV, a hybrid inverter and LFP storage configured around household energy use and outage priorities.

Solar System for Farm
Solar for irrigation pumping, cold rooms and farm buildings.

Solar Power System for Hotel
Solar plus storage that protects the guest experience.

Solar System for Factory
Rooftop or ground PV from 100kW to 1MW+, engineered around shift patterns, demand peaks and grid reliability.

Rack-Mounted Energy Storage Battery 50–500 kWh
Modular rack-mounted LFP storage from 50 to 500 kWh.

15KW 15KVA + 50KWH Solar System with Battery
15kW of three-phase power with 50kWh of LFP storage in a single cabinet.
Continue browsing.
The same product can appear in several categories — storage, power rating and application overlap by design.
Which architecture answers which grid
The choice is rarely about preference. It follows from one question: what happens to this site when the grid fails, and what does that failure cost.
| Architecture | Runs when the grid fails | Storage | Choose it when | What to accept |
|---|---|---|---|---|
| Grid-tied (on-grid) | No, the system shuts down | Optional, sized to project | The grid is reliable and the aim is a cheaper kilowatt-hour | No protection against outages |
| Hybrid | Yes, on the backed-up circuits | Integral to the design | Outages are frequent, scheduled, or expensive in lost output | Battery cost, and you need a critical load list |
| Off-grid | Yes, the system is the supply | Essential | There is no grid connection | Sizing must cover the worst-case sun and load, not the average |
Most commercial sites in our export markets land on hybrid. A full off-grid design costs materially more for the same daytime load, which is why it is reserved for sites with no connection at all.
Frequently asked questions
How long does it take to deliver the On and Off Grid Solar System?
End to end, 4–12 weeks. Requirement definition takes 1–3 days, system design 1–2 weeks, production 1–3 weeks, then every unit completes a 72-hour test before shipping, and shipping and installation take 2–6 weeks depending on the destination.
Is the On and Off Grid Solar System configuration fixed?
No. What is shown on this page is the reference configuration for the model — every system is sized against its own load data before it is quoted.
What testing does the On and Off Grid Solar System go through before shipping?
A 72-hour test. It is the fourth of five steps in our delivery process: requirement definition, system design, production, testing, then shipping and installation.
What is included in the On and Off Grid Solar System price?
Every component named on the quotation, plus factory assembly, the 72-hour test, export packing and the documentation set. Not included: sea freight, import duties and taxes, and site labour. Each quotation lists these on separate lines, so you can compare suppliers on the same basis.
Is installation included with the On and Off Grid Solar System?
Not as on-site labour. Our scope: the equipment as specified, tested before it ships, with the drawings and documentation your contractor works from, plus remote commissioning support and spare parts. Your scope: the base and civil works, crane placement, AC cable runs, the grid-connection cabinet and metering, local permits, and the installation labour. We do not keep installation crews abroad, so site work and its cost are quoted by your own contractor or local EPC.
Not sure which category fits?
Send the load profile, grid conditions and destination — we will name the architecture and the bill of materials.
Request a system proposal